About Us

From Passive House design and construction to high quality finishes, we pride ourselves in creating quality, sustainable and beautiful buildings using natural and durable materials.

“We focus on sustainability. Our buildings are designed to perform.”

Construction of offsite manufacture panels

Our Construction Team

Our experienced and qualified construction team specialise in bringing designs to life, manufacturing timber frame buildings in our factory and finishing projects on site.

Once the timber frame designs and construction details are created, our design and construction teams meet to discuss your project. They then create the panels in our factory and once complete, erect them on site in a matter of days.

We can also install triple glazed windows, external cladding or complete your project from plans to handing over the keys.

Nail guns for making timber frame houses
Measuring Smartply for Passive House Projects
Cutting timber for low energy and high performance buildings

Our House Building Factory

With over 25 years specialising in low energy, high performance buildings, our timber frame houses begin life in our house building factory, in Wales, as fully engineered, insulated and air-tight closed panels.

The materials in our build systems are predominantly timber based and procured locally where possible. By using Warmcel cellulose fibre insulation along with timber and woodfibre lining boards, timber I-beams, timber windows, and timber cladding, carbon is locked-in to create a sustainable building that is healthy, comfortable and enjoyable to live in.

Our Construction Process

We can pick up your project at any design stage, our typical process is:

      • Timber frame construction drawings designed & signed off by the customer
      • Design team handover to construction, talking through drawings
      • Manufacture and insulation of panels
      • Panels prepared for dispatch to site
      • Panels loaded, taken to site and offloaded with a crane
      • Building of soleplate & erection of panels on site
      • Client sign off

We understand that building your own home can be an exciting time but also an anxious time and so we will keep in touch through the process, updating and answering any questions.

PYC factory manufacturing Passive House buildings

Get familiar with the faces behind your project.

Ben Meade

Ben Meade

Director

Ben Wilson

Ben Wilson

Project Manager

Bobby Mann

Bobby Mann

Carpenter

Brooke Hevingham

Brooke Hevingham

Timber Framer

Burien Cox

Burien Cox

Timber Frame Designer

Carl Craig

Carl Craig

Workshop Manager

Dan Lloyd

Dan Lloyd

Timber Framer

Elfyn Williams

Elfyn Williams

Apprentice Timber Framer

Ryland Phillips

Ryland Phillips

Technician

Marius Van Lill

Marius Van Lill

Timber Framer

Tim Morris

Tim Morris

Foreman

Molly Meade-Brewin

Molly Meade-Brewin

Operations Manager

Read more about the construction of our timber frame panels.

The materials that we use and our construction team that carry out the work.