Ty Newydd
A turnkey construction project, this house was a complex design with five levels and a split ground floor.
- Date: July 2016
- Client: Mr & Mrs Montague
- Project Type: Turnkey
- Location: Mid Wales
About this Project
This project was built using a double stud timber frame, with a total wall insulation depth of 300mm fully filled with Warmcel.
The roof is constructed using metal-web ‘Posi-Joists’ and incorporates 300mm Warmcel insulation.
The external timber frame is clad in a woodfibre board which is a windtightness board and on the internal face is 15mm OSB, this is taped with Tescon Vana airtightness tape. The house has achieved an initial airtightness test of 0.9ach/hr.
The triple glazed windows and doors have been supplied and fitted by PYC and are the Green Building Store ‘Performance’ range.
Contact Us
Office Location
The House Building Factory, Buttington Cross Enterprise Park,
Welshpool, Powys, SY21 8SL
Open Hours
Monday – Friday : 8am – 5:30pm
Please call to arrange a visit.
Phone
01938 500 797
Please include your phone number so we can call you to discuss your project.